CN/EN

GET A QUOTE

Product Workshop

Follow us to get the latest information

Home/Workshops

Welcome to
New Leader Battery Factory

Green manufacturing: 100% clean energy drives production, carbon footprint tracking covers the entire industry chain, and reshapes the boundaries of industrial civilization with a 35% reduction in energy consumption;

Circular revolution: 90% core metal recycling rate builds a closed loop of materials, the cascade utilization network gives old batteries a second life, and the "old for green" plan activates the national carbon reduction action;

Ecological feedback: The integrated photovoltaic and storage solution lights up the powerless areas, and biodegradable materials protect the ocean. 2% of annual revenue is injected into forest carbon sinks and endangered species protection.

ODM /OEM Cooperation Process

  • 01
    Demand Matching
    Demand Matching
    Demand Matching
    • Cell selection (lithium iron phosphate/ ternary materials, etc.)
    • Structural design (size, heat dissipation, protection level)
    • Performance verification (cycle life, temperature control logic, safety testing)
  • 02
    Joint Development
    Joint Development
    Joint Development
    • Cell selection (lithium iron phosphate/ ternary materials, etc.)
    • Structural design (size, heat dissipation, protection level)
    • Performance verification (cycle life, temperature control logic, safety testing)
  • 03
    Prototype Confirmation
    Prototype Confirmation
    Prototype Confirmation
    • Cell selection (lithium iron phosphate/ ternary materials, etc.)
    • Structural design (size, heat dissipation, protection level)
    • Performance verification (cycle life, temperature control logic, safety testing)
  • 04
    Mass Production Delivery
    Mass Production Delivery
    Mass Production Delivery
    • Cell selection (lithium iron phosphate/ ternary materials, etc.)
    • Structural design (size, heat dissipation, protection level)
    • Performance verification (cycle life, temperature control logic, safety testing)
  • 01
    Mass Production Delivery
    Mass Production Delivery
    Mass Production Delivery
    • Cell selection (lithium iron phosphate/ ternary materials, etc.)
    • Structural design (size, heat dissipation, protection level)
    • Performance verification (cycle life, temperature control logic, safety testing)
  • 02
    Prototype Confirmation
    Prototype Confirmation
    Prototype Confirmation
    • Cell selection (lithium iron phosphate/ ternary materials, etc.)
    • Structural design (size, heat dissipation, protection level)
    • Performance verification (cycle life, temperature control logic, safety testing)
  • 03
    Demand Matching
    Demand Matching
    Demand Matching
    • Cell selection (lithium iron phosphate/ ternary materials, etc.)
    • Structural design (size, heat dissipation, protection level)
    • Performance verification (cycle life, temperature control logic, safety testing)
  • 04
    Joint Development
    Joint Development
    Joint Development
    • Cell selection (lithium iron phosphate/ ternary materials, etc.)
    • Structural design (size, heat dissipation, protection level)
    • Performance verification (cycle life, temperature control logic, safety testing)

Quality Management

  • Design Quality Control (DQC)
    Establish DFMEA (Design Failure Mode Analysis): Identify potential risks in battery cell chemical systems and structural designs (such as lithium dendrite growth and thermal runaway paths)
  • Process Quality Control (PQC)
    Pole coating: surface density fluctuation ≤ ±1.5%, using β-ray online monitoring Winding/stacking: alignment accuracy ±0.3mm, AI vision system to remove defective products in real time
  • Incoming Quality Control (IQC)
    Supplier classification management: Class A suppliers must pass IATF 16949 certification, and the monthly batch sampling rate must be ≥ 15%
  • Finished Product Quality Control (OQC)
    Electrical properties: capacity (0.5C discharge), internal resistance (AC 1kHz), self-discharge rate (72h ΔV<5mV)
Design Quality Control (DQC)
Process Quality Control (PQC)
Incoming Quality Control (IQC)
Finished Product Quality Control (OQC)